JOB NAME: WASCO HIGH SCHOOL MODULAR CLASSROOMS
JOB LOCATION: WASCO, CA
CLIENT: JTS CONSTRUCTION
CONTRACT VALUE: $525,000
FOREMAN: CLINT FOOR
DESCRIPTION:
CONCASTCO WAS CONTRACTED TO INSTALL STORM DRAIN, SEWER, FIRE WATER, AND DOMESTIC WATER FOR AN EXPANSION AT WASCO HIGHSCHOOL AS WELL AS INSTALL UTILITY INFRASTRUCTURE FOR FUTURE EXPANSION. CLINT FOOR AND HIS CREW NEGOTIATED SANDY SOIL CONDITIONS TO INSTALL STORM DRAIN ACROSS PALM AVENUE IN LESS THAN 5 WORKING DAYS FROM ASPHALT CUT TO ASPHALT PATCH.
THE FINAL OBSTACLE ON THIS PROJECT WAS A 30” CASING BORE UNDER A SWID IRRIGATION LINE. DUE TO TIME CONSTRAINTS AND AVAILABILITY OF OUR LARGER BORE MACHINES, WE COMPLETED THE 30” CASING BORE WITH A MACHINE DESIGNED FOR 12” CASING, WITH A FEW MODIFICATIONS, IN 4 WORKING DAYS.